Disclosure checks
Missing drill-hole table
Every drilling, resource and cash-flow announcement is checked against what the ASX itself focuses on when it reviews exploration results. A flag is not an accusation - it's a question worth asking before you invest.
The announcement does not give every hole's collar position, dip, azimuth, depth and result (including nil results), which the ASX expects for material exploration results.
CMM: Quarterly Activities/Appendix 5B Cash Flow Report - 29 Oct 2026The announcement does not give every hole's collar position, dip, azimuth, depth and result (including nil results), which the ASX expects for material exploration results.
SFR: September 2026 Quarterly Report - 27 Oct 2026Some holes, collar details or nil results are missing from the drill-hole table.
CMM: Further High-Grade Results at Lexington - 26 Oct 2026Some holes, collar details or nil results are missing from the drill-hole table.
EVN: Discovery and exploration - 15 Sep 2026The announcement does not give every hole's collar position, dip, azimuth, depth and result (including nil results), which the ASX expects for material exploration results.
EVN: 2026 Investor Briefing Presentations - 15 Sep 2026The announcement does not give every hole's collar position, dip, azimuth, depth and result (including nil results), which the ASX expects for material exploration results.
RRL: Appendix 4E and Annual Report 2026 - 21 Aug 2026Some holes, collar details or nil results are missing from the drill-hole table.
CMM: Quarterly Activities/Appendix 5B Cash Flow Report - 31 Jul 2026The announcement does not give every hole's collar position, dip, azimuth, depth and result (including nil results), which the ASX expects for material exploration results.
PRU: PRU June 2026 Quarter Report - 30 Jul 2026Some holes, collar details or nil results are missing from the drill-hole table.
RMS: March 2026 Quarterly Report and AISC Guidance Update - 29 Apr 2026What DrillScore checks
- Missing tables. A company reporting exploration results for a material project must include a drill-hole table (locations and intercepts) and sections 1 and 2 of JORC Table 1. JORC Table 1 explained
- Metal equivalents. The ASX's position is that equivalents aren't appropriate without metallurgical recovery information - with none given, it assumes 100% recovery. Metal equivalents explained
- Cherry-picking. Reporting only selected results breaches the JORC requirement for balanced reporting of low and high grades. DrillScore compares holes drilled with holes reported. Balanced reporting
- Visual estimates. The ASX discourages estimating mineralisation from visual inspection alone. Visual estimates
- Smearing. When one rich metre supplies most of a long interval's gram-metres. Smearing and the nugget effect
- Money. Fewer than 2 quarters of funding, or a raise that adds 15%+ more shares. Cash runway and raisings
General information only - not financial advice. DrillScore's analyses are produced automatically by an AI model (Claude, by Anthropic) from the company's own ASX announcement and public market data, and scored by a fixed formula (how it works). They can be wrong or incomplete, don't consider your objectives or circumstances, and are not a recommendation to buy, sell or hold anything. Always read the original announcement and consider advice from a licensed adviser.
Start the conversation
Discuss disclosure