Quarterly - ASX:CMM
Capricorn June quarter: 30,437oz at A$1,648/oz AISC, FY27 guidance 137-147koz, Mt Gibson drilling
Karlawinda produced 30,437 oz of gold in the June 2026 quarter at an all-in sustaining cost (AISC) of A$1,648 per oz. FY27 guidance is 137,000-147,000 oz at A$1,900-2,100/oz as the expansion ramps up. Cash and gold on hand were A$507.0m with no debt, after a A$22.8m maiden dividend. Mt Gibson drilling returned high-grade intercepts, but the Ricciardo gold-antimony equivalents rely on an assumed 90% recovery that has not been tested.
(price sensitive) - Capricorn Metals announced: "Quarterly Activities/Appendix 5B Cash Flow Report" (125 pages) - read the original
Score
What investors must know
- Karlawinda produced 30,437 oz in the June quarter at an AISC of A$1,648/oz, against A$1,617/oz in the March quarter. FY26 was a record 123,589 oz at A$1,629/oz, at the upper end of guidance.
- FY27 guidance is 137,000-147,000 oz at AISC of A$1,900-2,100/oz, with growth capital of A$70-85m. The midpoint is 18.3% above FY26 and assumes the expanded plant runs near 150,000 oz a year after commissioning in Q1 FY27.
- Cash and gold on hand were A$507.0m (A$504.8m cash plus A$2.2m gold). The company has no debt and no undrawn facilities, and the quarter included a A$22.8m maiden dividend.
- Gold sales were 34,271 oz at an average A$6,267/oz for A$214.8m of revenue. Sales exceeded production because gold on hand fell from 4,112 oz to 374 oz.
- Mt Gibson has federal EPBC approval and the WA Environmental Review Document has been lodged. Development is targeted for the December 2026 quarter, subject to permitting.
- Exploration highlights include 13.1m at 13.93 g/t Au at Lexington-Hornet and 15m at 14.61 g/t Au on the Mt Gibson open pit trend. Ricciardo reports 24.0m at 5.24 g/t Au and 0.34% Sb (5.96 g/t AuEq), with the AuEq based on an assumed 90% recovery.
The drill intercepts, normalised
Excellent - a genuinely strong hit by any ASX standard.
How this hit compares
Better than 98% of the 337 gold intercepts DrillScore has decoded in the past 12 months.
Among hits starting 150-400 m down-hole - a deep pit or an underground mine - better than 99% of 117.
The first gold drill result DrillScore has decoded for CMM - the next one will show whether it holds up.
Compare every hit, depth by depth and company by company - depth is down-hole, to the start of the interval.
How every hole did - one block per hole, coloured by its best hit
- Excellent 1
- Really good 2
- Good 18
- Modest 8
21 of 29 holes reached 'good' or better (1 excellent, 2 really good, 18 good); the other 8 were modest.
The holes, side by side - schematic, best hole first
Each line is a hole drilled from the surface (top); each block is a reported interval at its down-hole depth, sized by its width and coloured by its rating. The holes are side by side for comparison, not at their real positions, and are drawn only as deep as their deepest reported interval. Hover a block for the numbers; the 17 other holes are in the table below.
Every interval, in numbers
Every interval as metal-metres: width x grade (gram-metres for gold, %-metres for copper). Gold bands are Stockhead's rule of thumb: over 50 good, 100-200 really good, 200-500 excellent, beyond that stellar (and under 10, low). Top share is how much of an interval comes from its richest sub-interval - the smearing check.
| Hole | From | Width | Grade | Metal-metres | Rating | Top share | Notes |
|---|---|---|---|---|---|---|---|
| CMRC2471 | 181m | 15m | 14.6 g/t Au | Excellent | MGGP open pit trend. Highlighted in text. 0.5 g/t cut-off, 2m maximum... | ||
| CMRC2302D | 715m | 13.1m | 13.9 g/t Au | Really good | Lexington-Hornet underground. Highlighted in text (table gives... | ||
| CMRC2302D | 190m | 4m | 41.1 g/t Au | Really good | Lexington underground table. Not highlighted in the text. High-grade... | ||
| RDRC137 | 522m | 24m | 5.96 g/t AuEq eq. | Really good | Ricciardo gold-antimony. AuEq = Au + 2.12 x Sb%, using 90% assumed... | ||
| RDRC137 | 522m | 24m | 5.24 g/t Au | Really good | Plain gold grade, Sb 0.34%. Highlighted in text as 24.0m at 5.24 g/t... | ||
| CMRC1789 | 109m | 5m | 19.4 g/t Au | Good | MGGP open pit trend. Highlighted in text. 0.5 g/t cut-off, 2m maximum... | ||
| not identified | 439m | 27.5m | 3.24 g/t Au | Good | Lexington-Hornet highlight. Hole ID could not be matched to the... | ||
| RDRC080 | 377m | 72m | 1.18 g/t AuEq eq. | Good | Ricciardo wide, low-grade interval in appendix only, not in text... | ||
| RDRC080 | 377m | 72m | 0.550 g/t Au | Modest | Plain gold grade, Sb 0.30%. | ||
| CMRC3034 | 239m | 19m | 4.38 g/t Au | Good | Rothschild, Golden Range. Highlighted in text. 0.5 g/t cut-off, 2m... | ||
| CMRC2187D | 350m | 35.2m | 2.31 g/t Au | Good | Lexington-Hornet underground. Highlighted in text. 1 g/t cut-off... | ||
| CMRC3030D | 464m | 20.2m | 4.00 g/t Au | Good | Lexington-Hornet highlight. Table gives 464-484 at 20.20m. | ||
| CMRC3035 | 256m | 18m | 4.48 g/t Au | Good | Rothschild, Golden Range. Highlighted in text. 0.5 g/t cut-off, 2m... | ||
| CMRC2419D | 724m | 23.9m | 3.32 g/t Au | Good | Lexington-Hornet highlight. 1 g/t cut-off, 5.5m maximum internal... | ||
| CMRC1787 | 60m | 5m | 14.5 g/t Au | Good | Mt Gibson open pit highlight. 0.5 g/t cut-off, 2m maximum internal... | ||
| CMRC2411D | 382m | 12.9m | 5.49 g/t Au | Good | Lexington-Hornet highlight. 1 g/t cut-off, 5.5m maximum internal... | ||
| RDRC103 | 215m | 31m | 2.41 g/t AuEq eq. | Good | Ricciardo highlight 31.0m at 2.29 g/t Au and 0.06% Sb (2.41 g/t... | ||
| RDRC103 | 215m | 31m | 2.29 g/t Au | Good | Plain gold grade, Sb 0.06%. Highlighted in text. | ||
| RDRC101 | 195m | 21.6m | 3.21 g/t AuEq eq. | Good | Ricciardo highlight 21.6m at 2.94 g/t Au and 0.13% Sb (3.21 g/t... | ||
| RDRC101 | 195m | 21.6m | 2.94 g/t Au | Good | Plain gold grade, Sb 0.13%. Highlighted in text. | ||
| CMRC2492D | 681m | 11.8m | 5.64 g/t Au | Good | Lexington-Hornet highlight. 1 g/t table gives 681-693 at 11.80m. The... | ||
| RDRC085 | 365m | 52m | 1.20 g/t AuEq eq. | Good | Ricciardo wide, low-grade interval in appendix only. AuEq uses 90%... | ||
| RDRC085 | 365m | 52m | 1.06 g/t Au | Good | Plain gold grade, Sb 0.06%. | ||
| RDRC113 | 406m | 41m | 1.49 g/t AuEq eq. | Good | Ricciardo highlight 41.0m at 1.36 g/t Au and 0.06% Sb (1.49 g/t... | ||
| RDRC113 | 406m | 41m | 1.36 g/t Au | Good | Plain gold grade, Sb 0.06%. Highlighted in text. | ||
| CMRC2410D | 367m | 27m | 2.09 g/t Au | Good | Lexington-Hornet highlight. 1 g/t cut-off, 5.5m maximum internal... | ||
| CMRC2463D | 409m | 29.4m | 1.71 g/t Au | Good | Orion South underground highlight. 1 g/t cut-off, 2m maximum internal... | ||
| CMRC1934D | 402m | 14.5m | 3.45 g/t Au | Good | Orion South underground highlight (text 402.4-416.9m, table 402-417)... | ||
| CMRC3033DW2 | 577m | 9.1m | 5.05 g/t Au | Modest | Orion South underground highlight. 1 g/t cut-off, 2m maximum internal... | ||
| CMRC2401D | 378m | 1m | 45.4 g/t Au | Modest | Single 1m interval in Lexington table, not in text. Shows how one... | ||
| CMRC3033DW | 626m | 8.5m | 5.13 g/t Au | Modest | Orion South underground highlight. Table gives 626-635 at 8.50m. | ||
| CMRC2466D | 471m | 7.6m | 5.66 g/t Au | Modest | Orion South underground highlight. 1 g/t cut-off, 2m maximum internal... | ||
| CMRC2481 | 133m | 3m | 13.9 g/t Au | Modest | Mt Gibson open pit trend highlight. 0.5 g/t cut-off, 2m maximum... | ||
| CMRC3033DW2 | 641m | 3.2m | 12.7 g/t Au | Modest | Orion South underground highlight. Table gives 641-645 at 3.25m. | ||
| CMRC2423DW | 432m | 4.9m | 8.48 g/t Au | Modest | Orion South underground highlight (text 431.6-436.5m). 1 g/t cut-off... | ||
| CMRC1953 | 86m | 10m | 4.04 g/t Au | Modest | Mt Gibson open pit highlight. 0.5 g/t cut-off, 2m maximum internal... | ||
| CMRC3033DW | 664m | 1.3m | 28.7 g/t Au | Modest | Single 1.3m high-grade interval in Orion South underground highlights. | ||
| CMRC1989 | 114m | 6m | 6.07 g/t Au | Modest | Mt Gibson open pit highlight. 0.5 g/t cut-off, 2m maximum internal... | ||
| not identified | 128m | 4m | 7.24 g/t Au | Modest | Karlawinda regional, first-pass 4m composite from spear samples, so... | ||
| not identified | 108m | 4m | 4.18 g/t Au | Modest | Karlawinda regional, first-pass 4m composite. Hole ID not stated... |
Checked against the PDF. Every interval above is printed in the announcement itself - each width and grade was found, together, in the PDF's own text.
- Holes reported
- ? of 156 drilled
- Metres drilled
- 51,303
- Drilling
- RC and diamond core (RC pre-collar with NQ2 or HQ core); 1m RC samples and half-core sampling
- Cut-off grade
- 0.5 g/t Au for open pit and regional (Mt Gibson, Karlawinda); 1 g/t Au for Orion and Lexington underground; 0.5 g/t AuEq for Ricciardo
- Max internal dilution
- 2m for open pit, Orion, regional and Ricciardo; 5.5m for Lexington-Hornet underground
- True widths
- Not stated - intervals are down-hole
- Hole spacing
- Mostly infill and extension drilling. Resource-area RC spacing is 50m x 50m to 25m x 25m (JORC Table 1). Lexington, Hornet and Ricciardo are described as open. Karlawinda regional drilling is first-pass, with 4m composites that warrant follow-up.
- Depth
- Intercepts run from near surface to about 931m down-hole (CMRC2488D). Vertical depths are not stated.
Against the project's earlier holes
DrillScore has no earlier CMM intercepts on record, so no like-for-like comparison is possible. The announcement says Lexington results confirm depth and strike extension beyond reserve pit designs. Orion South results will feed the next MRE update.
Against similar explorers
Several Mt Gibson intervals are above 50 gram-metres (for example 15m at 14.61 g/t, about 219 gram-metres, and 13.1m at 13.93 g/t, about 182). Those are in the excellent range for gold drilling. Lower-grade long Ricciardo intervals are closer to typical explorer results.
Gram-metre calculator - gram-metres explained - the leaderboard
Disclosure checks - the ASX's own focus areas
- Drill-hole table (collars, dip, azimuth, depth, every intercept)caution
- JORC Table 1, Section 1 - sampling techniques and datapass
- JORC Table 1, Section 2 - reporting of exploration resultspass
- Competent person statementpass
- Metal equivalents with NO recovery figurefail
The ASX's position: equivalents aren't appropriate without metallurgical recovery information, and with none given it assumes 100% recovery.
- Balanced reporting - low and high grades both showncaution
Main-text highlights are the best intervals. The appendix tables carry many lower-grade and wide intervals, which helps balance. The announcement does not state how many holes were reported against the 297 holes drilled across programmes, and does not list nil results. Holes with prior reporting are not flagged.
- No visual estimates - assays onlypass
- Down-hole widths onlycaution
Down-hole intervals can overstate how thick the mineralisation really is.
Red flags and notes
Some holes, collar details or nil results are missing from the drill-hole table.
The equivalent formula is shown, but the metallurgical recovery for each metal in it is not stated with the test work behind it. The ASX expects recoveries to be disclosed for metal equivalents; without them it assumes 100%.
Main-text highlights are the best intervals. The appendix tables carry many lower-grade and wide intervals, which helps balance. The announcement does not state how many holes were reported against the 297 holes drilled across programmes, and does not list nil results. Holes with prior reporting are not flagged.
Only down-hole widths are reported. The announcement says Mt Gibson lodes dip steeply east and drilling is roughly perpendicular to them in most cases, but no true widths are given. The 156 holes and 51,303 m are Mt Gibson only (Lexington 36 holes, Orion South 31, open pit 89). Rothschild (50 holes, 8,729 m), Karlawinda regional (80 holes, 20,299 m) and Ricciardo (11 diamond holes, 1,834 m) are separate.
The text says quarterly operating cash flow was A$115.8m, but Appendix 5B item 1.9 shows A$135.1m. The reason for the gap is not explained.
Ricciardo AuEq applies an assumed 90% recovery from analogous antimony projects, not metallurgical test work. The announcement says recoveries will be updated later.
JORC Table 1 Section 2 states 'No metal equivalent values were reported' for Ricciardo, yet AuEq grades are reported in the text and tables.
Lexington-Hornet allows 5.5m of consecutive internal waste, against 2m for Orion and the open pit. Wider allowances can lengthen reported intervals, so the Lexington widths are not directly comparable.
Why these matter: JORC Table 1 - metal equivalents - balanced reporting - visual estimates
Money: can they follow it up?
Quarters of funding from the Appendix 5B (item 8.7). Under 2 quarters the ASX requires the company to explain how it will fund itself.
- Period ending
- 2026-06-30
- Cash
- $505m
- Debt
- $0
- Undrawn facilities
- $0
- Operating cash flow (quarter)
- $135m
- Exploration spend (quarter)
- $29.5m
- Total outgoings (quarter)
- $106m
- Gold produced
- 30,437 oz
- AISC
- A$1,648/oz (margin about A$4,244/oz at the day's gold price)
- Revenue
- $215m
- Guidance
- FY27 gold guidance 137,000-147,000 oz, an 18.3% midpoint increase on FY26 (FY26 guidance 115,000-125,000 oz). AISC guided at A$1,900-2,100/oz and growth capital at A$70-85m. FY26 actual was 123,589 oz at A$1,629/oz, at the upper end of guidance.
Production is gold produced in the June quarter (30,437 oz). Revenue is from 34,271 oz sold at an average A$6,267/oz (includes A$0.4m silver). The text gives operating cash flow of A$115.8m, but Appendix 5B shows A$135.1m. Cash is 504.8m per 5B, plus gold on hand of 374 oz (A$2.2m), giving the A$507.0m headline. Gold on hand fell from 4,112 oz, so sales exceeded production. Investing outflows were mainly KEP and MGGP capex (5B PP&E 43.9m, exploration 29.5m, other 14.3m). The maiden dividend of 22.8m drove financing outflows. The company has no debt and no undrawn facilities, and no raising, so it is funding growth from operating cash flow. Shares and options are not stated in this report. Related-party payments were A$0.489m. Figures are in A$, with no currency conversion needed.
Appendix 5B explained - why runway predicts raisings - every company's runway
How the price reacted
DrillScore 71 (top 50% of drill results), and on day 1 the stock moved -1.9% against the gold index (XGD). After 20 trading days: +0.1% against the XGD.
From the last close before the market could trade on it ($12.78 on 30 Jul 2026), with day-1 volume 1.7x the 20-day average.
CMM's past price-sensitive news
After 9 earlier announcements, CMM rose on day 1 4 times and fell 5 times - an average move of +1.6%.
DrillScore has no recorded share price reactions for CMM, so there is no baseline for how this news type has been received. The shares moved from A$12.78 (30 July close) to A$13.63 now, about +6.7%. Over the same period the ASX gold index XGD rose about 21%, while gold in A$ fell about 2.6%. That gap points to sector and index moves rather than this report alone. This is a description of the record only and does not predict the share price.
Past reactions describe what happened, not what will. How prices react to results
The historical pattern
What share prices did after past results like this one, from DrillScore's own records. It describes the past: it isn't a forecast for CMM and it isn't advice.
After 5 other drill results rated 'Strong', stocks moved +0.4% by day 1, +0.2% by day 5 and -0.3% by day 20 against the XGD on average.
- Day 1
- +0.4%
- Day 5
- +0.2%
- Day 20
- -0.3%
Only 1 of CMM's earlier announcements have traded - too few to show a pattern.
In the 20 trading days before this release the XGD gold index moved +4.4% (rising). After 38 past gold announcements released into a rising gold index, stocks moved +1.9% by day 1, +2.2% by day 5 and -5.5% by day 20 on average - before taking the market's own move out.
- Day 1
- +1.9%
- Day 5
- +2.2%
- Day 20
- -5.5%
A strand leans up or down when its day-5 average is 1% or more either way. Each is shown on its own and never added up into a prediction: small samples swing, and every result is different. The full backtest - how it's worked out
The market it landed in
| Market | On the day | Now | Since |
|---|---|---|---|
| Gold (US$/oz) | US$4,100 | US$3,886 | -5.2% |
| Gold (A$/oz) | A$5,892 | A$5,737 | -2.6% |
| Copper (US$/lb) | US$6.44 | US$6.09 | -5.5% |
| AUD/USD | 0.6959 | 0.6774 | -2.7% |
Gold was US$4,100/oz (COMEX) and A$5,892/oz at release. It is now US$3,886 and A$5,737, down 5.2% and 2.6% since release. The June quarter realised A$6,267/oz, well above both. Against FY27 guided AISC of A$1,900-2,100/oz, spot in A$ leaves a wide margin. The reserve optimisation uses a gold price of 2,600 (currency not stated, presumably A$), which is well under current spot, so the reserve price deck looks conservative against today. Royalties rose about A$100/oz above guidance because of the higher gold price. Copper (down 5.5% since release) and COPX (down 12.9%) matter less for gold producers. Silver fell 16.5%. Sector context: GDX is up 6.3% since release and GDXJ is flat. The US 10-year yield rose to about 5.15% and the US dollar index rose 3.4%, both headwinds for gold. This is context only and not a forecast.
Against CMM's own history
DrillScore has no earlier CMM intercepts or raisings on record. The cash balance of A$507m reported on 27 July 2026 matches this report's A$507.0m cash and gold. The 27 July study update (scored 66) cited reserves of 5.24Moz and a Mt Gibson PFS at 260koz a year, which this report refers back to. The FY27 guidance step-up is consistent with that update's expansion case.
Risks & caveats
- Commissioning of the Karlawinda Expansion Project (KEP) and the ramp to about 150,000 oz a year are still ahead. Output in the first year could fall short of the run rate assumed in guidance.
- FY27 AISC guidance sits above FY26 actuals, partly because royalties rose about A$100/oz with the higher gold price and because the reserve case now includes lower-grade ore.
- Mt Gibson development depends on finishing WA state approvals (Part IV of the EP Act), and the timing has not been confirmed.
- Ricciardo AuEq values assume 90% metallurgical recovery from analogous projects, not test work. The AuEq prices are from a 2024 study (US$2,200/oz gold).
- Lexington-Hornet and Orion South are not yet in resource updates. The Lexington results are drill intercepts only, and the Orion update is still to come.
- The operating cash flow in the text (A$115.8m) does not match the Appendix 5B figure (A$135.1m). The reason is not explained.
What's next
- KEP commissioning of crushing, milling and CIL circuits, starting the ramp to about 150,000 oz a year - Q1 FY27 (September 2026 quarter), per announcement
- Mt Gibson development start, subject to completion of WA permitting - December 2026 quarter, targeted, subject to permitting
- Orion South underground Mineral Resource update, including the June quarter intercepts - not stated
- Potential maiden Inferred underground Mineral Resource estimate for Lexington-Hornet - not stated
- FY27 production and cost delivery against guidance of 137,000-147,000 oz - FY27 (year to June 2027)
Questions worth asking
- Why does the text give quarterly operating cash flow of A$115.8m while Appendix 5B item 1.9 shows A$135.1m?
- Has KEP commissioning started and is the ramp to about 150,000 oz a year on track, given the Q1 FY27 target?
- What metallurgical test work will replace the assumed 90% recovery used for Ricciardo AuEq, and when?
- Which holes are the 27.5m at 3.24 g/t Lexington-Hornet interval and the Karlawinda regional 4m composites, and were any of the reported holes previously announced?
- When will the state Part IV approval for Mt Gibson and the Orion South MRE update be expected, and what does that mean for the December 2026 quarter development start?
What it means
For someone following Capricorn, the June quarter shows Karlawinda running steadily at about 30,000 oz a quarter, with A$507m of cash and gold and no debt. The main test in the coming year is whether the expansion commissions on time and lifts output towards 150,000 oz a year, while AISC guidance rises to A$1,900-2,100/oz. Mt Gibson has federal approval, but state approvals and development still have to come, so its timing depends on permits. The exploration results include high-grade intercepts, but they are drill results without updated resources, and the Ricciardo equivalent grades rest on an untested recovery assumption. This is general information only and not a recommendation to buy, sell or hold.
General information only - not financial advice. DrillScore's analyses are produced automatically by an AI model (Claude, by Anthropic) from the company's own ASX announcement and public market data, and scored by a fixed formula (how it works). They can be wrong or incomplete, don't consider your objectives or circumstances, and are not a recommendation to buy, sell or hold anything. Always read the original announcement and consider advice from a licensed adviser.
Decoded 15 Nov 2026, 8:17 am by claude-haiku-5-5 - confidence: medium. Spotted a mistake? Tell us.
Start the conversation
Discuss CMM's announcement